Find your industry ›
BFG engineered and fabricated a GRP cowling system for the iconic link bridge connecting Bahrain's World Trade Centre towers. Working with Atkins as engineering consultants, BFG delivered lightweight yet robust composite panels that were installed beneath the bridge, providing a clean, aerodynamic finish while protecting the bridge's structural elements from the harsh Gulf climate. The project was completed in 2010.
Architecture
World Trade Centre, Bahrain
Project
GRP cowling under link bridge
Location
Bahrain
Client
World Trade Centre
Engineering Consultants
Atkins
Main Contractor
AMA Bahrain
Handover
2010















