Home About Us Client Testimonials

Proven Performance

Our clients' words speak for themselves. From 34-year-old structures still in pristine condition to recommendations from global OEMs, these testimonials demonstrate the lasting quality of BFG composite solutions.

34+ Years Oldest Structure
0 Major Repairs Needed
20+ Station Shelters Delivered
6 Countries Referenced
Client Recommendations
Bahrain Bayan School FRP corridor
34+ Years

The FRP structural corridor supplied by BFG 34 years ago is in very good condition till now. We did not carry out any major repairs or rehabilitation work. Colour of the exterior panels remain same as supplied by BFG.

FRP Structural Corridor — Bahrain Bayan School

Mrs. Randa Qiblawi, Business Office Manager

Architecture
Al Fateh Grand Mosque dome
30+ Years

The main dome at Al Fateh Islamic Center (Grand Mosque) was constructed almost 30 years ago. As of date, the main dome remains in good condition, requires no major repair works. Aesthetically the Dome is found of excellent quality both inside and outside.

Main Dome — Al Fateh Grand Mosque

Huda Mirza Abbas, Director Building Maintenance
Ministry of Works, Kingdom of Bahrain

Architecture
Bombardier Talent 2 train
2007–2018

BFG have been involved in the design, manufacturing and installation of completely integrated toilet systems and train interior GRP panels since 2007. All toilet cabins and interior panels are still in use and in good conditions. We have no hesitation in recommending them.

Talent 2 Toilet Cabins & Interior Panels

Annemarie Kwade, Manager System Procurement
Bombardier Transportation, Hennigsdorf, Germany

Rail
Jebel Ali Sewage Treatment Plant GRP covers, Dubai
2008–2010

BFG have been involved in the design, manufacture and installation of GRP covers for several reservoirs and tanks at Jabel Ali Sewage Treatment Plant, Dubai. All GRP covers are still in use and in good conditions. BFG carried out all works in a professional manner.

GRP Covers — Jebel Ali Sewage Treatment Plant

Nikolas Tsimas, Project Manager
Al Ahmadiah Aktor LLC, Dubai, UAE

Infrastructure
Prince Mohammed Bin Abdulaziz International Airport, Madinah
2013–2014

BFG International has consistently performed its duties in speedy and competent fashion for all types of GRC & GRP elements, done in the best way, with hard working and good cooperative conduct with all Project staff. We would recommend dealing with BFG for similar work.

GRP & GRC Elements — Madinah International Airport

Cumhur Kaur, Project Director
TAV & Al-Arrab Contracting JV, Saudi Arabia

Architecture
Work Completion Certificates
Doha Metro station

Doha Metro — Qatar Integrated Railway Project

GRP panel supply and installation for station shelters across Red, Green and Gold lines

Red Line South — 9 Stations

Shelter GRP panels • IMAR (RLS-JV) • 2018–2019

Red Line Elevated — Economic Zone

Taking Over Certificate • FCC-Yüksel JV • June 2018

Green Line — 6 Stations

White Palace, Hamad, Messila, Al Qadeem, Al Shaqab, QNL • IMAR • 2018–2019

Gold Line — Sports City

5 SPC station shelters • IMAR (ALYSJ JV) • 2020

Contact BFG to discuss your project